To help protect people, communities and farmland in the Fraser Valley’s Sumas Prairie from future flood events, the Barrowtown Pump Station in Abbotsford will receive significant flood-resilience upgrades.
“The November 2021 Sumas Prairie floods were catastrophic and also could have been much worse if the pump station had failed,” said Premier David Eby. “We know that we are going to see more frequent and severe weather events that threaten people’s homes, livelihoods and communities. Ensuring that the Barrowtown Pump Station is equipped and ready for the near term, while we do longer-term work on international agreements and modernization, is how we will keep people and this community safe for decades to come.”
The Barrowtown Pump Station is a critical piece of infrastructure to the Sumas Prairie’s flood-protection system. Originally opened in 1983, the pump station was built to pump water out of the low-lying prairie lands via the Sumas Canal and into the Fraser River but was nearly overwhelmed when flood waters breached the Sumas River dike during the atmospheric rivers of November 2021.
“The 2021 atmospheric river event was devastating to people in the Sumas Prairie and they deserve to know that action is being taken to protect them from a future event,” said Bowinn Ma, Minister of Emergency Management and Climate Readiness. “We have been working with communities on dike and infrastructure repairs to build resilience in the face of future flooding events, and these upgrades to the Barrowtown Pump Station are the next concrete action to help ensure the safety of people and B.C.’s vital farmland.”